Womens Dresses Online Adrianna Papell Beaded Long Lead

£139.64  £90.23

  • Model: Clothes 301282
  • 416 Units in Stock

Please Choose:

  • L
  • M
  • S
  • XL
  • XS
  • XXL
  • XXXL


Add to Cart: decreaseincrease    
This product was added to our catalog on Thursday 15 March, 2018.

Womens Dresses Online Adrianna Papell Beaded Long Lead
Womens Dresses Online Adrianna Papell Beaded Long Lead
Womens Dresses Online Adrianna Papell Beaded Long Lead


Product description

Opt for striking elegance at your next event with this Beaded Long Dress by Adrianna Papell.
The sleeveless evening gown boasts a tulle overlay hand embellished with shimmering pewter beads and sequins in a vintage-inspired lattice and floral pattern.
Its empire line cut creates a striking mermaid silhouette with sheer boat neckline and open back detail. Partly lined, in stretch fabric that ensures a flawless fit.
Let the dress speak for itself by teaming it with simple strapped heels.
Shoulder to hem length: 153cm (on a size 12).
Brand:Adrianna Papell
Dress Shap:Empire Line
Length:Maxi
Main Fabric:Embellished
Material:100% Polyester
Model Details:5ft 6.5 inches and wears a UK Size 8
Necklin:Round Neck
Pattern:Pattern
Sleev:Sleeveless
Washing Instructions:Spot Clean Only


cheap branded clothes | cheap clothing stores | cheap womens clothes | cheap clothes for men